Finale: EVAC made it.

The dome testing was a success. EVAC and Kedah Boy-Boy made it. We didn't face any big difficulties during the execution of the testing. We successfully changed position and stood on the dome. The only minor problem is the plywood we stepped on was not stable and cracked when we stepped on it.

DSC_0818

DSC_0812

DSC_0810

The 2012 Craft test is now done. We learnt a lot from the project. Team coorperation is the main business.
The Kedah Boy-Boy wants to thank En. Wan B for creating such a challenging but useful project.
Thanks to those who helped. Thanks Foong You Sheng as the photographer of our team. :)

Wednesday, September 22, 2010

Finally.......



              


Overview of  Evac




Thursday, September 2, 2010

Prototype Testing Report [3/9/2010]

**********************
Intention
**********************
To test the float-ability of the base built.
***************** 
Act
*****************
Moving base to USM swimming pool.
 ******************
Product
*******************

Our base.


*****************
Actor
*****************



********************
Principle
********************

*****************
Place
*****************


[Testing with 1 people]
 


 





 














Stability and floatability with 1 people is very nice.



[Testing with 2 people]
Base is starting unstable and having symptom of sink



















[Testing with 3 people]
Base sank and very unstable.

















Result of testing is still far from satisfactory and will having some modify on our base for improving floatability.Second prototype test will have conduct later.