The dome testing was a success. EVAC and Kedah Boy-Boy made it. We didn't face any big difficulties during the execution of the testing. We successfully changed position and stood on the dome. The only minor problem is the plywood we stepped on was not stable and cracked when we stepped on it.
The 2012 Craft test is now done. We learnt a lot from the project. Team coorperation is the main business.
The Kedah Boy-Boy wants to thank En. Wan B for creating such a challenging but useful project.
Thanks to those who helped. Thanks Foong You Sheng as the photographer of our team. :)
Disaster of 2012 with DEVASTATING FORCE is detected!!!
Thursday, September 30, 2010
Wednesday, September 22, 2010
Saturday, September 4, 2010
Updates: Week 5 updated and Prototype Report.
Here to inform that the Week 5 updates had been posted. Please refer to
Prototype testing report:
Thank you for viewing!
Thursday, September 2, 2010
Prototype Testing Report [3/9/2010]
**********************
Intention
**********************
*****************
Act
*****************
******************
Product
*******************
Actor
*****************
********************
Principle
********************
*****************
Place
*****************
[Testing with 2 people]
Intention
**********************
To test the float-ability of the base built. |
Act
*****************
Moving base to USM swimming pool. |
Product
*******************
*****************
********************
Principle
********************
*****************
Place
*****************
[Testing with 1 people]
Stability and floatability with 1 people is very nice.
Base is starting unstable and having symptom of sink |
[Testing with 3 people]
Base sank and very unstable. |
Result of testing is still far from satisfactory and will having some modify on our base for improving floatability.Second prototype test will have conduct later.