Disaster of 2012 with DEVASTATING FORCE is detected!!!

Thursday, September 2, 2010

Prototype Testing Report [3/9/2010]

**********************
Intention
**********************
To test the float-ability of the base built.
***************** 
Act
*****************
Moving base to USM swimming pool.
 ******************
Product
*******************

Our base.


*****************
Actor
*****************



********************
Principle
********************

*****************
Place
*****************


[Testing with 1 people]
 


 





 














Stability and floatability with 1 people is very nice.



[Testing with 2 people]
Base is starting unstable and having symptom of sink



















[Testing with 3 people]
Base sank and very unstable.

















Result of testing is still far from satisfactory and will having some modify on our base for improving floatability.Second prototype test will have conduct later.


No comments:

Post a Comment